DERs - Heterogeneous Multi-Agent Voltage Regulation

The DERs benchmark is a cooperative multi-agent reinforcement learning (MARL) task on a distribution feeder. Twelve heterogeneous agents on case141 coordinate to keep voltages inside [0.94, 1.06] per-unit (p.u.) while reducing network loss. The agents are 4 batteries, 4 PV inverters, and 4 flexible loads placed at different buses along the feeder. For power-system background terms such as DER, p.u., voltage regulation, and radial BFS power flow, see the Power systems primer.

This page describes the benchmark contract. A key point up front: the benchmark task exposes an explicit constraint specification, but the current benchmark training path is still reward-shaped IPPO rather than an online constrained MARL optimizer with dual updates.

At A Glance

  • Physical env: distribution-grid env on case141 with 12 heterogeneous resources.
  • Benchmark task: 12-agent cooperative voltage-regulation and loss-reduction MARL.
  • What is actually trained: typed-parameter-sharing IPPO variants with fixed reward shaping; ippo_lagrangian is present in the result surface but is not the DERs headline.
  • Primary leaderboard quantity: mean_p_loss_mw.
  • Safety gate: zero voltage-violation target in the task config.

For a first pass, read this page in four layers: the summary above, the task-spec table, the reward-and-cost section, and finally the training / eval workflow. That order is especially important here because the task definition is constraint-aware, while the current formal training path is still reward-shaped.

Task specification

Field Value
Task type 12-agent cooperative Dec-POMDP with local observations
Agents 12 (4 battery + 4 pv + 4 flexload)
State \(\mathcal{S}\) bus voltages, branch flows, resource operating status, time-of-day phase
Observation \(\mathcal{O}_i\) local K-hop neighborhood, 15-D (1 + K + 3 + 2 + 5 with K=4)
Action \(\mathcal{A}_i\) Box(2) per agent
Transition \(\mathcal{P}\) resource actions change injections and flexible demand, then case141 distribution power flow and safety checks are applied
Reward \(r_t\) shared team reward \(r_t = -w_{\mathrm{loss}}\, P_{\mathrm{loss}, t}^{\mathrm{MW}}\)
Cost \(\mathbf{c}_t\) task constraint vector \(\mathbf{c}_t = \left(C_t^{\mathrm{volt}}, C_t^{\mathrm{therm}}, C_t^{\mathrm{resource}}\right)\)
Threshold \(\mathbf{b}\) task-level safety gate is voltage_violation_rate <= 0.0 (single voltage gate, from task.yaml::safety_thresholds); the IPPO-Lagrangian config additionally uses per-channel cost_thresholds: [0.0, 0.0, 0.0] over (voltage, thermal, resource) for its dual variable, but those are training-side budgets and not the leaderboard gate
Discount \(\gamma\) 0.995
Horizon \(T\) 48 steps x 30 min = 24 h
Initial \(\mu_0\) split-driven real-data episode on case141

Dec-POMDP means decentralized partially observable Markov decision process: each agent acts from a local observation, but all agents share one team-level return.

Underlying physics

The task is built on the distribution-grid stack described in Physics -> Distribution and Physics -> Resources. The formal benchmark uses case141, a 141-bus Caracas-area feeder, and attaches 12 heterogeneous resources.

At the physical env level, voltage safety, thermal overload, and resource-side violations are tracked separately. The DERs task keeps those channels in its task-level constraint specification:

\[ \mathbf{c}_t = \left(C_t^{\mathrm{volt}},\, C_t^{\mathrm{therm}},\, C_t^{\mathrm{resource}}\right) \]

However, the current benchmark training path does not run an online constrained MARL algorithm on this vector. Instead, the training presets use reward shaping with fixed voltage penalties. That distinction is important: DERs is constraint-aware at the task-definition level, but the current formal trainer is still a shaped-reward MARL path.

Benchmark task parameters

Parameter Value
Case case141
Agents 12 (4 battery + 4 pv + 4 flexload)
Action per agent Box(2)
Observation per agent local K-hop neighborhood, 15-D (1 + K + 3 + 2 + 5 with K=4)
Episode 48 steps x 30 min = 24 h
Voltage limits [0.94, 1.06] p.u.
Primary metric mean_p_loss_mw (lower_is_better)
Safety gate zero voltage-violation target in the frozen task config

Agent deployment

Type Count Buses Notes
Battery 4 9, 55, 17, 122 0.10 MW / 0.30 MWh
PV 4 6, 73, 72, 82 0.20 MW nameplate
FlexLoad 4 41, 70, 135, 24 0.10 MW curtail / shift cap

Each agent has a 2-D action, but the physical meaning depends on the resource type. The benchmark uses typed parameter sharing in training, so batteries, PV inverters, and flexible loads need not share one policy head. See Training -> Trainers for IPPO and typed parameter sharing.

Reward and cost

The shared team reward is the feeder-loss objective:

\[ r_t = -w_{\mathrm{loss}}\, P_{\mathrm{loss}, t}^{\mathrm{MW}} \]

where \(P_{\mathrm{loss}, t}^{\mathrm{MW}}\) is the total network active-power loss at step \(t\), shared by all 12 agents.

The task-level constraint vector is

\[ \mathbf{c}_t = \left(C_t^{\mathrm{volt}},\, C_t^{\mathrm{therm}},\, C_t^{\mathrm{resource}}\right) \]

matching the task ConstraintSpec and the underlying distribution env diagnostics.

Constraint channel definitions:

Symbol Constraint name Typical info / metric key Meaning
\(C_t^{\mathrm{volt}}\) voltage_violation cost_voltage_violation, voltage_violation_steps, voltage_violation_rate Voltage-safety channel; counts whether any bus is outside the configured voltage band on a step, and is summarized as violation steps/rate.
\(C_t^{\mathrm{therm}}\) thermal_overload cost_thermal_overload Thermal branch-overload diagnostic from the underlying distribution power-flow env.
\(C_t^{\mathrm{resource}}\) resource cost_resource, total_cost Aggregate resource-side constraint cost from batteries, PV inverters, and flexible-load bundles.

The current benchmark training path then shapes the reward with a fixed voltage penalty rather than learning a dual variable:

\[ r^{\mathrm{train}}_t = r_t - \lambda_{\mathrm{volt}} C_t^{\mathrm{volt}} \]

where \(\lambda_{\mathrm{volt}}\) is the configured voltage_penalty. In the frozen benchmark setup:

  • ippo uses the base DERs training config with a moderate fixed voltage penalty.
  • ippo_safe uses a stronger fixed voltage penalty.

So safe here means stronger fixed shaping, not a separate constrained optimizer.

What "safe" means here

ders-medium-safe does not change the underlying physical task. It uses the same env, the same agents, and the same task-level constraint channels. What changes is only the training objective:

  • ippo: reward-shaped team training with a moderate fixed voltage penalty (voltage_penalty=4.0)
  • ippo_safe: reward-shaped team training with a stronger fixed voltage penalty (voltage_penalty=8.0, twice the unconstrained 4.0; paper Appendix H.2 calls this baseline IPPO-rs)

ippo_lagrangian is reported in the formal result surface as a CMDP variant, but the current evidence does not make it the DERs headline. This is why the DERs benchmark page should not describe the current formal training path as online CMDP / Lagrangian MARL.

Baselines

Name Description
no_control all DER actions = 0
volt_droop voltage-droop rule-based baseline with local reactive / curtailment response

The volt_droop baseline is the stronger hand-crafted anchor used in the benchmark summaries.

Algorithms

Algo Preset Notes
ippo ders-medium typed-parameter-sharing cooperative MARL baseline
ippo_safe ders-medium-safe same MARL path with stronger fixed voltage penalty
ippo_lagrangian ders-medium-safe CMDP variant retained in the formal matrix; not the headline row because it remains brittle on PV shift

Hidden dims (128, 128); gamma 0.995; total timesteps 10e6; 5 seeds for Phase-1 JAX/GPU reporting. The mandatory seed-0 backend/device matrix has official eval rows on train, iid, voltage_tightening, pv_penetration_shift, and load_stress.

Eval splits

Split Description
train training distribution
iid held-out in-distribution episodes
voltage_tightening tighter voltage band
pv_penetration_shift shifted PV penetration
load_stress higher demand stress

The 3-phase wrapper remains available for evaluation experiments, but it is not part of the frozen benchmark split list.

Metrics

The DERs page is easiest to read if metrics are separated into layers:

Layer Key Description
Step reward reward shared per-step team reward
Step constraint channel voltage_violation voltage-safety channel; summarized by voltage_violation_steps and voltage_violation_rate
Step constraint channel thermal_overload branch thermal-overload diagnostic from the grid env
Step constraint channel resource aggregate resource-side constraint diagnostic from attached DER bundles
Episode aggregate total_reward cumulative shared reward
Episode aggregate total_cost cumulative continuous safety-cost diagnostic
Episode aggregate mean_p_loss_mw mean network active-power loss
Episode aggregate voltage_violation_steps number of steps with voltage outside limits
Episode aggregate voltage_violation_rate fraction of evaluated steps with any voltage violation
Relative evaluation summary loss_reduction_pct loss reduction vs no_control
Relative evaluation summary cost_reduction_pct continuous safety-cost reduction vs no_control
Relative evaluation summary NormScore benchmark-normalized score against frozen baselines

Convergence target is loss, not reward

The frozen DERs convergence target is based on mean_p_loss_mw, not on total_reward. That is deliberate: the benchmark treats physical loss as the primary leaderboard quantity, so convergence is bound directly to that physical metric. Do not compare episode reward across leaderboard entries.

Quick start

python benchmarks/ders/run_all.py --only baselines --seeds 0 1 2 3 4
python benchmarks/ders/run_all.py --only train --algos ippo ippo_safe ippo_lagrangian --seeds 0 1 2 3 4
python benchmarks/ders/run_all.py --only eval
python benchmarks/ders/run_all.py --only summarize
python benchmarks/ders/run_all.py --only plots

Shared workflow terms are defined in the Benchmark workflow glossary.